The link below downloads a copy of the Strategic Master Plan’s Chapter 3 section 4, which provides illustrations on priority projects 13 through 15 - Huntington Park improvements, south bank Monroe underpass, and High Bridge Park master planning. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Chapter 3.4 (972 Kb, Acrobat® file)
Posted by FOF Admin at 08:47 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s Chapter 3 section 3, which provides illustrations on priority projects seven through 12 - gorge loop trail, Centennial Trail completion, southern gateway development, Peaceful Valley launches, the whitewater park, and the tribal cultural center. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA. Note: this is a large file, so give it time to download!
SMP Chapter 3.3 (3.9 Mb, Acrobat® file)
Posted by FOF Admin at 08:41 PM.
Filed under:
Gorge Plan •
Permalink
In October of 2002, just after the release of the Gorge Conceptual Plan, Spokane’s CityCable 5 produced a 15-minute show on the project, including its background, and key projects and opportunities. Nicely-shot images of the Lower Falls and Gorge area, plus interviews with then City Planner Steve Franks, Spokane Tribe Culture Director Bryan Flett, and Rick Hastings of Friends of the Falls. Click the image to watch.
Concept Plan Video (32 Mb, QuickTime® file)
Posted by FOF Admin at 09:05 AM.
Filed under:
Gorge Plan •
Permalink
Page 5 of 5 pages « First < 3 4 5