The link below downloads a copy of the Strategic Master Plan’s “Appendix B”, which provides a site evaluation for potential whitewater park locations in the Gorge area, as well as basic layouts and functions of typical features. Prepared by Recreation Engineering and Planning of Boulder, Colorado.
SMP Appendix B (1.6 Mb, Acrobat® file)
Posted by FOF Admin at 10:46 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s “Appendix A”, which provides a table version of the numerous priority projects discussed in the plan, including estimated costs, implimentation actions, and groups/agencies likely to lead each. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Appendix A (76 Kb, Acrobat® file)
Posted by FOF Admin at 10:41 PM.
Filed under:
Gorge Plan •
Permalink
Here’s a downloadable copy of one of the exhibits contained in the full Strategic Master Plan - an aerial photograph including the entire study area. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Aerial Map (316 Kb, Acrobat® file)
Posted by FOF Admin at 10:32 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s Chapter 4, which provides detailed information on key elements of the plan environment, including transportation, recreation, economic development and habitat restoration. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA. Note: this is a large file, so give it time to download!
SMP Chapter 4 (5.8 Mb, Acrobat® file)
Posted by FOF Admin at 08:53 PM.
Filed under:
Gorge Plan •
Permalink
Page 4 of 5 pages « First < 2 3 4 5 >