The link below downloads a copy of the Strategic Master Plan’s “Appendix D”, which provides an overview of goals and guidelines for potential habitat restoration activities in the Gorge area. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Appendix D (84 Kb, Acrobat® file)
Posted by FOF Admin at 11:04 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s “Appendix C”, which provides an overview of goals and guidelines for potential interpretive facilities in the Gorge area. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Appendix C (104 Kb, Acrobat® file)
Posted by FOF Admin at 10:55 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s “Appendix B”, which provides a site evaluation for potential whitewater park locations in the Gorge area, as well as basic layouts and functions of typical features. Prepared by Recreation Engineering and Planning of Boulder, Colorado.
SMP Appendix B (1.6 Mb, Acrobat® file)
Posted by FOF Admin at 10:46 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s “Appendix A”, which provides a table version of the numerous priority projects discussed in the plan, including estimated costs, implimentation actions, and groups/agencies likely to lead each. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Appendix A (76 Kb, Acrobat® file)
Posted by FOF Admin at 10:41 PM.
Filed under:
Gorge Plan •
Permalink
Page 17 of 24 pages « First < 15 16 17 18 19 > Last »