The link below downloads a copy of the Strategic Master Plan’s Chapter 4, which provides detailed information on key elements of the plan environment, including transportation, recreation, economic development and habitat restoration. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA. Note: this is a large file, so give it time to download!
SMP Chapter 4 (5.8 Mb, Acrobat® file)
Posted by FOF Admin at 08:53 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s Chapter 3 section 4, which provides illustrations on priority projects 13 through 15 - Huntington Park improvements, south bank Monroe underpass, and High Bridge Park master planning. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA.
SMP Chapter 3.4 (972 Kb, Acrobat® file)
Posted by FOF Admin at 08:47 PM.
Filed under:
Gorge Plan •
Permalink
The link below downloads a copy of the Strategic Master Plan’s Chapter 3 section 3, which provides illustrations on priority projects seven through 12 - gorge loop trail, Centennial Trail completion, southern gateway development, Peaceful Valley launches, the whitewater park, and the tribal cultural center. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA. Note: this is a large file, so give it time to download!
SMP Chapter 3.3 (3.9 Mb, Acrobat® file)
Posted by FOF Admin at 08:41 PM.
Filed under:
Gorge Plan •
Permalink
Here’s a link to a Denver Post article about two champion whitewater kayers - Jed and Katie Selby - who are working to create a 3/4-mile whitewater park in tandem with a New Urbanist subdivision along the Arkansas River in Buena Vista, Colorado. Written by Jason Blevins, Staff Writer, published October 25, 2004.
Denver Post article (244 Kb, Acrobat® file)
Posted by FOF Admin at 03:18 AM.
Filed under:
Whitewater Park •
Permalink
Page 18 of 23 pages « First < 16 17 18 19 20 > Last »