The link below downloads a copy of the Strategic Master Plan’s Chapter 3 section 2, which provides illustrations on priority projects three through six - north point overlook, visitor’s arrival point, confluence restoration, and the north point restoration effort. Prepared by planning consultant Moore Iacofano Goltsman of Berkeley, CA. Note: this is a large file, so give it time to download!
SMP Chapter 3.2 (3.8 Mb, Acrobat® file)
Posted by FOF Admin at 12:02 AM. Filed under: Gorge Plan •

